Close

Store Establishment Plan

A building permit is often required to set up a construction site, and today’s construction workers always need a place to change clothes, eat breakfast, and use the restroom—with a roof over their heads. Since 2022, it has been a legal requirement to provide employees with such a space, and we’ll help you develop a site office plan that meets all your needs—even if it’s a site office-turned-movie theater with solar panels on the roof.

When do I need a building permit to set up a shed?

When do I need a building permit to set up a shed?

The Building Board’s processing time is a maximum of ten weeks, which means we are usually eager to quickly draw up a complete site setup plan for you.

To obtain an approved building permit, it is important to include:

  1. Fire Safety
  2. Inspection Plan as Required by the Planning and Building Board
  3. Accessibility: How is the flow managed with dependencies such as access roads and office sheds?
  4. Self-inspections
  5. Installation Plan: Depending on the ground pressure, how we support the ground before installing the shed

How long does it take to set up a booth?

How long does it take to set up a booth?

First, we make sure that electricity, water, and sewer connections are in place at the site; once we get the go-ahead for the booths, we’ll set them up within a couple of days. Of course, it can also be done in a single day—it all depends on the conditions, and if we’re able to work completely undisturbed, we’ll naturally be able to finish faster.

We have local installation teams throughout the country

We have local installation teams throughout the country

Over the years, our installation teams have set up sheds on piers, worked high up in the air, and installed thousands of sheds across our long, narrow country. They also build decks for the sheds and completely remodel them to suit your needs. We’re ready for any challenge, and we’re everywhere.

DAB needed a plan—we made it happen

DAB needed a plan—we made it happen

Read more
Max will quickly put together an APD plan for you

Max will quickly put together an APD plan for you

Contact our storage unit experts directly

Jonatan Storm

Jonatan Storm

Bodmontageledare norra Norrland (utgår från Boden)

Björn Andersson

Björn Andersson

Bodmontageledare Stockholm (utgår från Rosersberg)

Dan Rönningen

Dan Rönningen

Bodmontageledare Gävle-Dalarna (utgår från Borlänge)

Emil Egmyr

Emil Egmyr

Bodmontageledare Småland (utgår från Västervik)

Lars Elvingsson

Lars Elvingsson

Bodmontageledare Halland (utgår från Varberg)

Michael Lexman

Michael Lexman

Bodmontageledare Göteborg (utgår från Sisjön)

Mikael Johansson

Mikael Johansson

Bodmontageledare Västergötland (utgår från Trollhättan)

Lennart Johansson

Lennart Johansson

Bodmontageledare Mitt (utgår från Västerås)

Tobias Wedman

Tobias Wedman

Bodmontageledare mellersta Norrland (utgår från Umeå)

Tom Brandt

Tom Brandt

Bodmontageledare Skåne (utgår från Landskrona)

Sandra Ählman

Sandra Ählman

Bodmontageledare Östergötland (utgår från Norrköping)

We'll help you with your storage needs

    Our depots